INVESTMENT ADVISORY SERVICES PROVIDED BY:
CA Dhiraj Ostwal
YOUR VISION, OUR EXPERTISE — STRATEGIC INVESTMENT SOLUTIONS
PRIVATE & CONFIDENTIAL
NDA REQUIRED FOR COMPANY IDENTITY
Key Differentiator: Unlike the industry norm of outsourcing to sub-contractors, the company keeps all personnel on its own rolls or as contract labour — ensuring total control, guaranteed efficiency, and timely project completion.
Total Control Model: Company does not sub-contract. All personnel on company rolls or as contract labour, enabling meticulous planning, streamlined sites, guaranteed efficiency, and maximisation of profits.
| Financial Year | EBITDA (₹ Cr) |
|---|---|
| FY 2025 | — |
| FY 2024 | — |
| FY 2023 | ₹2.57 Cr |
| Financial Year | PAT (₹ Cr) |
|---|---|
| FY 2025 | -₹1.98 Cr |
| FY 2024 | ₹0.95 Cr |
| FY 2023 | ₹1.53 Cr |
| Metric | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 |
|---|---|---|---|---|---|---|---|
| Revenue (₹ Lakhs) | 1,153 | 938 | 1,528 | 1,307 | 957 | 1,560 | 2,100 |
| EBITDA (₹ Lakhs) | 26 | -34 | 128 | -159 | 60 | 179 | 257 |
| PAT (₹ Lakhs) | -26 | -43 | 91 | -199 | 18 | 15 | 220 |
| Net Worth (₹ Lakhs) | 1,889 | 1,846 | 1,937 | 1,738 | 1,756 | 1,895 | 2,115 |
Revenue grew to ₹2,100 Lakhs in FY23 with PAT of ₹220 Lakhs — a strong recovery from pandemic-impacted years. Net Worth has been consistently maintained above ₹1,700 Lakhs throughout the period.
Context on Financials: Peak turnover of ₹3,039 Lakhs achieved in FY2012-13 with EBITDA of ₹771 Lakhs. Post-founder passing, orders were taken selectively. The company has since re-focused, rebuilt its order pipeline, and is on a strong recovery trajectory.
| Designation | Experience |
|---|---|
| Director / Sr. Vice President | 40 Years |
| President / Deputy | 35 Years |
| Asst. General Manager | 25 Years |
| General Manager | 20 Years |
| Project Manager | 25 Years |
| Sr. Engineer | 25 Years |
| Sr. Engineer | 20 Years |
| Asst. Engineer | 16 Years |
| Engineer | 10 Years |
| Engineer QA/QC | 9 Years |
Organisation Structure: Board of Directors → Sr. Vice President → Asst. General Managers (Projects, Safety, QA/QC) → Project Managers → Engineers (Electrical, Piping, Mechanical) → Stores & Accounts.
Key Industry Challenge: Working capital intensive, low entry barriers, projects awarded to lowest bidder. This company's differentiated no-subcontracting model and blue-chip client relationships insulate it from typical commodity competition.
| Industry Challenge | Company's Approach |
|---|---|
| Low entry barriers, highly fragmented market | 40-year reputation & blue-chip client relationships as moat |
| Working capital stress from milestone-linked payments | Meticulous planning ensures timely milestone achievement |
| Projects awarded to lowest bidder | Selective bidding — quality and relationship-led wins, not price |
| Rising labour wages squeezing margins | Captive workforce with lower attrition; efficiency from internal control |
| Sub-contractor quality and timeline risk | Eliminated — no sub-contracting model |
| Client | Location | Job Description | Duration |
|---|---|---|---|
| GEA Energietechnik GmbH, Germany | Uran, Maharashtra | Fabrication & Erection of Structures, large diameter pipes & Specials (up to 4.2 mtrs dia), sand blasting & painting, Equipment incl. insulation & Electricals for 2×120 MW Air Cooled Condenser — 6,000 MT | 14 Months (on schedule) |
| Kanakdhara Steel Ltd. | MIDC Industrial Estate, Paithan, Aurangabad | Fabrication & Erection of Structural building and cladding work for High Alloy and Special Steel Casting Plant | 6 Months (on schedule) |
| Tata Vashisti Detergent Ltd. | LoteParsuram, Chiplun, Maharashtra | Fabrication & Erection of Steel Structures for building including civil & sheeting and cladding work for Fatty Acid Plant & Hydrogenation Plant | 6 Months (on schedule) |
| Remi Metals Gujarat Ltd. | Bharuch, Gujarat | Erection of building structural, electromechanical works, overhauling & installation of integrated Seamless Tube Plant equipment for 2,500 MT Billet Rolling Mill, AsselMill, PilgerMill with water hydraulic (400 bar) & utility piping, electrical installation including transformers, control panels, switchgear, cabling and commissioning | 6 Months (on schedule) |
| Nippon Kokan K.K (NKK) | Uran, Maharashtra | Civil, structural and piping works at Ethane Propane Recovery Project at ONGC Uran | 5 Months (on schedule) |
| Bharat Forge Ltd. | Mundhwa, Maharashtra | Erection of 5,000 T press line equipment for the Mundhwa Plant | 5 Months (on schedule) |
100% On-Time Delivery: Every project listed above was completed within the scheduled timeline — a testament to the company's meticulous planning, captive workforce model, and strong execution culture built over 40 years.
Strategic Fit: Ideal for an industrial conglomerate, EPC player, PE fund with infrastructure/engineering thesis, or strategic acquirer seeking a ready platform with 40 years of relationships, a captive workforce, and immediate revenue visibility of ₹25+ Crore.
This document is a confidential Blind Investment Teaser prepared for preliminary discussions with potential investors. The identity of The EV Charging Infrastructure Company and all additional detailed information will be shared only with qualified investors upon execution of a Non-Disclosure Agreement (NDA). Unauthorised distribution or reproduction of this document is strictly prohibited. The information contained herein is indicative and subject to change.
Private & Confidential · This teaser does not disclose the company name · All information is indicative
We look forward to connecting under NDA
For detailed due diligence, partnership discussion, and company identity disclosure, please reach out to our advisory team.
CA Dhiraj Ostwal
dhirajostwal@gmail.com · 70200 45454